Alsons Consolidated Resources Inc. (ACR) subsidiary Conal Holdings Corp. (CHC) is seeking Energy Regulatory Commission (ERC) approval to connect its power plant in Bohol to the Visayas grid.
The National Grid Corporation of the Philippines (NGCP) is hopeful the legal impediment preventing Line 2 of the 500-kiloVolt Hermosa-San Jose (HSJ) transmission line in Bataan lifts and the system energized.
The National Grid Corporation of the Philippines (NGCP) is fully prepared for the surge in power demand from the Visayas as the 230-kiloVolt Cebu-Negros-Panay (CNP) backbone project formally connected to the grid for the first time.